Local guides · Post 33

The snagging list a Pembrokeshire builder owes the client

For builders and small firms in Pembrokeshire: the snagging list and handover pack that lands the day the job ends, and what leaving it to memory costs you.

The last fix is in at a house in Narberth. The client has paid most of the bill. You stand in the kitchen, run a hand over the worktop, and start a list in your head: the door that sticks, the tap that drips, the paint near the skirting that wants a second coat.

That list gets written on the van dashboard on the way to the next job in Milford Haven. By the time you are back in Haverfordwest the next morning, half of it is gone. Three weeks later the client emails asking where the handover pack is: the certificates, the guarantee dates, who to call about the boiler.

Nothing here is hard. It is a second job that arrives the day the first one ends, and it has no slot in the week.

The maths (a sketch, not a client figure)

Assume a finished job needs a snagging pass and a handover pack. Assume the admin sits with the person who ran the job, at an assumed £30 an hour. Both are assumptions, not a measured figure.

  • × 90 minutes a week across live jobs = the time cost
  • × £30 an hour = £45 a week
  • × 46 working weeks = £2,070 a year

Now the same work with a draft step. The list is captured as it is found, the pack is drafted from the job details, and a person reads and approves it before anything reaches the client.

Score it: the three checks

  • Hours. An hour and a half a week or more, once the walk round, the typing and the calls about certificates are counted. That clears the bar for most builders.
  • Repeat. Snag lists follow the same shape every time: room, fault, who fixes it, by when. If that shape can be written on one page, it can be drafted for you.
  • Risk-if-wrong. A missed snag is a return visit and an argument about who pays for it. A pack without the right certificate can hold up a sale or the final payment. That is why the completion decision stays with a person.

Try one thing this week (free)

Before you leave your current job, walk it room by room and write every snag on one sheet in the client's words, with a date beside each line. Hand the client a copy and keep one for yourself. By Friday you will know how long the list really takes to gather, and whether your memory was as good as you thought.

Where a person stays

Software can hold the list as you walk the job and turn it into a tidy document. It can pull the guarantee dates and certificates into one pack and flag which jobs are waiting on a signature. A named person still decides what counts as done, what the client is told, and when the pack goes out. The completion decision, the wording of anything awkward, and every financial, compliance or legal line stay with a human. Nothing is sent unchecked.

FAQ

Who owns the snag list once the job ends?

You do, until the client signs it off. The aim is to have it written and dated, rather than carried in your head.

What goes in the handover pack?

Whatever the job needs: guarantee dates, certificates, who to call, and the snag list with dates against each line. Software gathers it, and you approve the finished pack.

Can the client add snags after handover?

They often do. A dated list turns that into a conversation about a new visit, rather than a dispute about what was agreed.

Does the software tell the client the job is finished?

No. A person decides when the job is complete and when the pack goes out. The software only prepares it.

What does it cost to start?

The £499 diagnostic. One fixed fee: a one-hour call, a written report, and a follow-up call ranking what to hand over first. 5 hours a week found or a full refund, and the whole fee credits against any build.

Do this next

  1. If the number warrants a wider map: the £499 diagnostic. A one-hour call, a written report, and a 30-minute follow-up where we recommend what to build first. 5 hours found or full refund, and the £499 is credited in full against any build.
Book the Diagnostic